Though, we are instead thinking about turning that sleeping porch into a closet, so the estimate won't be reduced by all $50K. But it should be quite a bit less, because we won't need to get plumbing up there. Instead we will, at some point, redo the existing upstairs bathroom, but not until after this remodel. We need at least one operational bathroom when our house is torn up.
During our trip, we did go drop by Fireclay Tile in San Jose. (It was an amazing place!!) And they did have not-quite-white 3"x6" subway tile in the "boneyard." But the tiles seemed to have tiny dark specs under the glazing and I thought it would really bug me. Also the tiles weren't always uniform in size. I'm guessing maybe these particular tiles were seconds and I wouldn't have been happy with the quality. Especially since most of the expense of the installation is likely to be labor.



















