Closet Shellacked

I finally got my act together this week and continued work on my closet. I varnished the top shelf and did two coats of shellac on all the rest of the woodwork. (I used varnish on the top because I was hoping it would be more durable when we slide tubs and boxes across the surface.) 

We still need to finish making shelves for the cabinets. Unfortunately, the guy we hired to help us with this project cut the wood incorrectly and now we have to either buy more sheets of plywood or piece some of the shelves. Right now, Jeff is trying to piece the wood. 

I've also been working on cleaning my sewing room again. For the past few months, I've had a bad habit of finishing a project and then moving on to the next project without actually cleaning up the mess from the project I just finished. I had piles of fabric all over the place and a mountain of scraps overflowing onto the floor.

I've temporarily shifted some of the stuff from my sewing room into the closet to give myself more room to work. I will likely be moving some of the tubs from the sewing room into the closet permanently, but I still have a lot of boxes I need to unpack first to see how much room I have left.

I ordered brass rods and flanges and we got the rods last week, but the flanges were back-ordered. The shipping date looks like they may come next week. I'm hoping.

Thursday, April 1, 2021

Closet Installed

We made good progress on our closet the past few days. We've installed the fixed shelving on the right side and face frame on the cabinets. Most of the wood was shellacked before it was installed, but I still need to shellac the face frame pieces. I would have shellacked everything, but I was worried there may be damage during the install and I figured it would be easier to touch up just stain.


Back when we did the rest of the closet I bought all the brass rods and brackets we needed to finish this closet, but then we used them in the guest room and sewing room closets, so today I ordered more. (If I had remembered, I would have ordered weeks ago.) I was relieved I could still find them, but it wasn't easy.

We still need to cut plywood shelves for the cabinets. And I have about two weeks to finish shellacking everything before we receive the rods.


Sunday, March 28, 2021

Enjoying the Yard

I have really been enjoying all the beautiful plants out in the yard. Flowers started quite early with the Hellebores blooming in winter.

Hellebore of an unknown variety. Planted by an earlier resident.
This is an Hellebore 'Apricot Blush'. The flowers are red on the outside,
but apricot on the inside. Very lovely.
The white hellebore is a 'Picotee Pearl.' It has grown really
fast so it must love that spot. The pink hellebore to the right was a
gifted plant I got from a neighborhood friend. 
Most of the crocuses came out right before our freak snow storm
but didn't last too well with all the weight of the snow on them.
Epimedium x warleyense
We have so many daffodils coming up in the yard. I tried to dig up
the clumps last year and spread them out, but I guess I missed a couple.
Corydalis solida ‘Purple Bird’. I thought this one died because
it's a summer deciduous plant but there it is! Yay!
Hyacinth 'Gipsy Queen'
The Red Flowering Currant is only days away from being absolutely stunning.

Saturday, March 27, 2021

Douglas Fir Staining

I put the last coat of stain on the plywood pieces this morning. 

Then, this afternoon, Jeff and I spent a couple hours finalizing the right side shelf design and measured and cut out the rest of the douglas fir. It didn't make much of a dent in our douglas fir stash out in the garage.

Tomorrow morning I'll put on the second coat of stain. It is possible we could start installing them as early as tomorrow afternoon, though we may want to wait until Monday morning to make sure they're totally dry.


Thursday, March 25, 2021

Closet Progress

The boxes are built and installed. The douglas fir plywood is cut and ready for staining.

I know how I get to spend the weekend.


Monday, March 22, 2021

Next Up: Closet Shelving

We got a new toy! We're going to have to get rid of more stuff from the garage to make room for this!
Last Friday we went and bought the plywood to make the cabinets for the bedroom closet so hopefully, progress will begin soon. As a reminder, this is the plan.
I haven't made much progress on the back stairs since my last post. I bought a can of paint for the balusters and we scrubbed it down to get off most of the dirt, but now we need it to dry out enough to sand it. I need at least a week of dry weather to refinish the wood. 

Sunday, March 14, 2021

Front Porch is Finished

Jeff from Hand Made Home finished our front porch. It looks amazing. It took three coats to get a nice even finish.

This was the before.
He obviously removed the old decking and replaced it with new wood.

The cedar for the back stair railing has been cut out. We got some help with the cutting from a guy named Tracy Livingston who used to be a contractor and is trying to get back into the game.
They were removed after this photo so I can paint them before the final install. Since we're out of the paint, I'm basically waiting for the next paint sale then I'll go buy a gallon.

I'm also waiting for several days of nice weather so I can sand down the deck and apply a new finish. Given the current forecast, it could be a couple of weeks.