Monday, July 13, 2015

Master Bath Planning

The master bathroom shower plumbing is just about kaput. It's been hobbling along since we moved in, but this week it plugged up to the point it's not draining. Jeff is planning to try to snake it, but I think it's a bigger problem than that. I'd hate to ignore the problem until we start seeing water stains on the living room ceiling.

We therefore need to turn our attention to finally finishing this bathroom. The timing sort of stinks with the new car purchase, but really this is the LAST room in the house we have to finish. Once we do this, our remodel plan above ground will be DONE. (We still want to remodel the basement family room/gaming lair, but that's a plan for another year at this point.)

I've been cruising around my Pinterest boards to rediscover my master bath inspiration pictures. We'll have to do this job on the cheap, so I doubt we'll be hiring a general contractor to manage this job.
That means it will probably take months and months given my recent experience of getting ahold of contractors. Sigh. At least we have a shower in the basement to tide us over in the meantime.

We'll be borrowing heavily from the style of the main floor bath. We just need to adapt it for a shower. And I'm definitely going to be putting in a tile floor. This is the one I really like.

Did I say cheap? Well, you know what we mean. Cheap for us. LOL

No comments:

Post a Comment