For the past couple of weeks, I've been slowly plugging away at painting the railing for the back stairs. We didn't have enough sawhorses to paint everything at once so I've had to paint everything in two batches. It was a little painful to put paint on this beautiful clear cedar, but I've learned the hard way that it won't look so beautiful after a couple years of weathering.
First I did the batch of balusters inside the garage. I applied a coat of exterior primer on all four edges and then I did the same with a good quality exterior paint.
|
All finished and ready to be installed |
Then, once we had the tablesaw moved into the garage, I set up the rails outside under the porte cochiere. They're getting their last edge painted later today, then Jeff will finally get his parking space back.
I had hoped to finish this stair railing project before summer arrived, but in March I decided I would rather
finish my closet first because I was tired of the disarray in the bedrooms. Then, by the time that project was finished, it had started to rain. A lot.
I figured it made the most sense to sand and finish the stair decking before we installed the rails which will require a week of clear weather when it's not-too-crazy hot. I'm crossing my fingers it will happen soon because I'm eager to get this wood out of the way in the garage. I have some other projects I would like to work on.
No comments:
Post a Comment