Monday, June 4, 2012

Random Paint Stripping

I spent today doing random paint stripping tasks; I'm trying to continue making forward progress on this project. Jeff uninstalled a couple of the smoke alarms, so I was able to begin working on the door jamb.


Then I got distracted with trying to see how difficult the paint would be to strip from the linen cabinet. It was fairly easy to remove the paint from the drawers, but the doors were much more difficult. 

I uninstalled them so I could bring them in for dipping, but I have realized the doors on there are not original. I believe Mr. Leonard may have made them to match the kitchen when he remodeled in the 1940s. The original doors were inset as there is an outline of butterfly hinges on the face frame. Too bad we didn't find any spare cabinet doors in the attic last year. 

So now I'm trying to decide whether we should go to the expense of stripping/refinishing these existing doors when we're going to want to replace them as soon as possible. Perhaps not.

I also spent a fair amount of time applying KleanStrip to clean up woodwork in the room. I'm hoping by mixing up the different tasks, it will make the last part a bit less tiresome.

Hired Garage Contractor

In the interest of actually getting the project done this summer, we broke down and hired a contractor to rebuild/remodel our garage. We hired Tim Austin, LLC who gave us a quote of about $20K for the project (about 2/3rds of all the other quotes). I thoroughly investigated his contractor license history (no complaints) and I called three of his references (who gave glowing reviews) and I perused about 20 pictures of his earlier outbuilding projects so I am pretty confident we'll get the garage built as spec-ed out.

He is going to try and get our original garage design approved, but we're expecting now the city will hold firm to their no eave ruling and we'll have to build the one with the gable rotated. I've signed a contract and put down a 50% deposit and Tim's hoping he'll have the permit approved in 3 or 4 weeks. We're hoping for a June 25 start date on demolition.

In addition to the garage, we are planning to add a bit of cement work so we can also deal with this messed up driveway of ours. Thanks to massive walnut tree roots uplifting it, the driveway is now sloped toward the house and garage, which has so far meant some pretty substantial puddles in the garage during particularly rainy weeks. (The basement has so far been pretty dry since we had it repaired right after buying the house.)

We are planning to put in something along these lines, with a gap in the center. We're hoping this design will absorb more of the rain flowing down the driveway.

I'm heading out of town early Wednesday for a week to visit family. It's actually quite hard to tear myself away from all these projects, but I haven't visited family for over a year. Jeff is staying home this time, so perhaps some projects will continue to have some progress in my absence. Hopefully he'll find the motivation to work on paint stripping and the front planting strip, which is currently quite ugly right now.


Sunday, June 3, 2012

Tired of Paint Stripping

We've made some progress on paint stripping this weekend, but I've realized I've lost my enthusiasm for this project; I just want it done.

Jeff worked several hours stripping paint from the picture rail. It's tedious and takes quite a while because of all those different curves. Thank you Jeff!

I started stripping the paint on the door jamb with the heat gun, but the smoke alarm kept going off. We simply must uninstall that thing or we're going to have to kill it! So I switched to cleaning up the wood around the window with the chemicals (KleanStrip).

I also did some exploratory stripping of a drawer in the linen cabinet built-in. It was interesting to find the interior of the drawer was stained with a semi-transparent green/olive stain. I think this was the original finish in the dining room (in 1912), at least that's what I think was at the bottom of all those layers. I'm now wondering if the bedrooms also started out with this same finish.

The large entry doors take 4 days to strip by hand, so I'm thinking about taking in the last one to be dipped. I haven't decided... I may not because this door only needs to be stain-ready on one side and I'd be paying to have both sides cleaned when it's not necessary. But I am getting so tired of this project.

I'm also thinking I'll take in the bathroom door and the doors of the linen cabinet to be dipped. I'm ready to finish this stripping and staining project and get the floors refinished and move back into the upstairs. We're approaching a year for this upstairs refinish project; it's way past time we finished it.

Friday, June 1, 2012

Guest Bedroom Start

We haven't gotten the guest bedroom completely emptied out, but we moved the furniture to one side. We'll continue to empty this room out as we work around the room. We masked the floor and got all the tools to the room and we're ready to go. The window sill and frame were started last summer when the window was replaced. We're still dealing with a lack of energy, but we're trying to keep moving along on this project. (This guest bedroom MUST be done by early December, my father and step-mother are coming to stay with us for a week.)



We haven't emptied out the closet either. These two missing doors are the doors I've finished stripping already. We'll rehang them once we strip the paint off the door jambs.

My current plan is to finish this bedroom and then have the floors finished in both the master bedroom and this bedroom at the same time.

After 2 or 3 hours of effort, the first pass on half the baseboard is done.


Tuesday, May 29, 2012

Guest Bedroom Doors

Since I'm still recovering from this stupid cold, sanding seemed to be about the right speed given my low energy level today.

I spent a couple more hours this afternoon on the guest bedroom door paint stripping project. I've stripped and sanded like crazy, but totally cleaning these molding corners continues to elude me. I just can't find the right tool; I've tried the chemicals with dental tools, detail sanders and sponge sanders, but they just don't clean these edges. So, in the interest of my sanity, I've decided to declare the two guest bedroom doors finished!

Luckily, our dark stain will probably cover this paint residue.


So, I've now finished two of the three doors in the guest room. There is still one more door that exits onto the sleeping porch. That one, luckily, only has to be stripped to stain-ready on the inside of the door. The sleeping porch is still too damp during the winter to risk a stained finish on the outside.

Monday, May 28, 2012

How Does Our Garden Grow?

Very well, apparently. We had a week of rain and our garden has quite burst to life. Jeff's been able to pick fresh lettuce for our meals, which has been wonderful. We're looking forward to the tomatoes later in the summer, especially the purple ones.

Here is how it looked a couple of weeks ago, when Jeff first planted it.

Sunday, May 27, 2012

Garage Rebuild Plan

Thanks to us both getting sick, we've now managed to be mostly unproductive for nearly two weeks. Ugh.

The one important thing we've managed to do this week is to make a decision about the garage. We've decided to hire one of the contractors we got a quote from last month, Tim Austin. We called three of his references and got glowing reviews, looked up his contractor's license, and looked at lots of pictures of his earlier projects, so we're pretty confident we'll end up with what we are hoping for.

The current design plan is to go with the garage with the rotated gable because it makes the most sense given what the City will allow us to build.

We're going to go ahead and tear down the existing garage and replace the slab because the existing slab has a couple of deep cracks that run its length in both directions. I don't think it makes sense to spend a bunch of money residing and re-roofing a structure that won't last at least 25 years (the amount of time we plan to live in this house).

Now, we just have to feel well enough next week to empty out the garage so demo can start as soon as the permit is approved and Tim has time in his schedule for this project. Here's to hoping we have a good week.