We made good progress on our closet the past few days. We've installed the fixed shelving on the right side and face frame on the cabinets. Most of the wood was shellacked before it was installed, but I still need to shellac the face frame pieces. I would have shellacked everything, but I was worried there may be damage during the install and I figured it would be easier to touch up just stain.


Back when we did the rest of the closet I bought all the brass rods and brackets we needed to finish this closet, but then we used them in the guest room and sewing room closets, so today I ordered more. (If I had remembered, I would have ordered weeks ago.) I was relieved I could still find them, but it wasn't easy.

We still need to cut plywood shelves for the cabinets. And I have about two weeks to finish shellacking everything before we receive the rods.