We might fiddle with a couple of pieces of glass and lead came, but it's mostly ready for soldering. We also need to figure out how to cut out that metal border. We have a bunch of really long pieces and we'll need to cut them down to properly fit them to the outside edges.
Thursday, September 30, 2021
Nearly Finished
Friday, September 17, 2021
Making Progress
I've been working pretty steadily on my stained glass project and I think I'm on track to finish by the end of the month. I'm finding the closer I get to the end, the easier it is to motivate myself to work on it.
This piece is going to suck! It will probably take hours of grinding to get it right.Tuesday, September 14, 2021
Dream Basement Plan
I spent a couple days playing in SketchUp again. The plan isn't as complete as I would like because my version is so old I can't download the fun free downloads.
We have a big job ahead of us getting rid of all the extra stuff that will no longer fit. LOL
Since we still have a TON of douglas fir in our garage, we are going to try and build that media cabinet behind the TV. The shelves are double-sided. The front side is the right depth for DVDs and the backside is a little deeper for the storage closet. The right side open shelves are for the home theater gear and our printer.
Tuesday, September 7, 2021
More Stained Glass
Saturday, August 28, 2021
So Much Purging
We have spent weeks sifting old boxes. On the bright side, opening 15-year old boxes is like going to the store and getting new stuff without paying. It's also a lot easier to get rid of stuff we haven't touched for so long.
We've filled up the car twice this past week to get rid of stuff. And I've had a parade of people coming by to pick up free stuff. I love our neighborhood Buy Nothing lists.
![]() |
| Here's how it looked on Aug 19. |
Sunday, August 22, 2021
Finishing the Basement
I don't know if I've mentioned it here on this blog, but last month I ordered a Handiquilter long arm with a 12' frame. So, now I need a space that is 14'x7' to set it up. Even though this house is really quite big in total square footage, most of the rooms are pretty small by modern standards so there is really only one good place to set it up, the basement family room.
I've been slowly sifting and downsizing during the pandemic, but now I am finally getting thrown into high gear. I am so looking forward to having a quilt studio down in the basement.
For folks who have followed us for a while, you'll know our basement is like a dungeon. There are some windows, but not very many, and mostly they are under bump-outs, so they don't provide much extra light. And there are only a couple of single-light bulb ceiling lights.
We're planning to hire Tim Austin again to help us finish the space. (He's the guy who built our garage for us.) I'm hoping he can help us get the room wired up for better lighting and some decent outlets and I'm hoping to replace the battle-scarred sheetrock ceiling with some sort of panel system, probably something along these lines. In the old days, I had big plans to makeover the basement and make it beautiful, now I'll be satisfied with bright and comfortable.
Ideally, I would like to get the work done before I take delivery on the long arm, so we're going get started as soon as Tim is available, which is about two months. That will certainly provide a good deadline for finishing that stained glass project and cleaning out the space.
This is the area I am planning to turn into the quilt studio.
The goal is to move the workout gear into the front storage area. We're trying to empty and collapse three racks. We've been making good progress on the project.
Friday, August 20, 2021
Stair Railing Progress
Our forecast calls for nice cool weather for several days so it seems like a good time to finally get this railing installed. We made good progress this afternoon.
We have a couple more hours of work to install the outer boards and the flat upper portion. Then I'll have to touch up the paint.

















