The bathroom fixtures were installed in the main floor bathroom today! Hooray! Since March, we've been hauling ourselves up two flights of stairs to use the bathroom up there; now we'll be able to just go up one.This bathroom is not actually done yet. There is still a wood moulding to be installed along the top edge of the tile. And the linen cabinet in the wall opposite the toilet still needs a door.
The faucet was also installed in the kitchen. It's not hooked up yet, though, because the wrong size part came for the sink drain and they have to get a new one.
No comments:
Post a Comment