Conserva Irrigation is installing our drip system this week. We've had a few plant casualties from the trenching and channel drilling but overall the plants that survive will appreciate the reliable summer water. And once the installation is finished, I have a few more native plants to add to the yard.
Tuesday, October 4, 2022
Monday, September 19, 2022
Lots of New Projects
![]() |
| Before the clean up, it was hard to see but we could no longer find the path, and many plants were growing over each other. |
![]() |
| The columnar apple tree in front of the house had gotten a little out of control and it was also full of wisteria vines. |
![]() |
| I don't have a good before photo of this bed. Generally, the plants reached the bottom branches of the apple tree and the apple tree had many lower branches so this space is opened up quite a lot now. |
So, yeah, that's a lot of upcoming work. We're spending way too much money on this house again. I haven't even added it all up and I'm sure I don't want to. But at least Jeff is working again so it won't all be coming out of savings.
Tuesday, August 16, 2022
Cleaning the House Exterior
We have waited too long to deal with some exterior house maintenance issues. The gutters with screens on top didn't really do the job for us. They'd probably be better if your house wasn't surrounded by tall trees. The leaves just sat on top of the screens and in heavy rains the water backed up onto the roof and over the past 10 years, it's done some damage to the roof structure. I am not going to crawl up there and take a bunch of photos, but you can see this area easily from the ground.
Anyway, we decided to buy LeafGuard Gutters. We had them at our last house and really liked them. And they have the feature that if they ever get clogged, they'll come and clean them for free. Though, I will say, OMG the salesman wasted so much of our time. He spent 3 hours selling us gutters when he could have done it in under an hour. We already knew their benefits and that we wanted them, but they won't give you the price until they go through their lengthy pre-programmed spiel. They'll be installed sometime next month.Wednesday, July 27, 2022
Hired a Cleaner
It's been quite a while since the kitchen was this clean. With Jeff working again, we have a budget to hire some cleaning help because goodness knows I stink at cleaning because without the deadline, it just doesn't happen enough. But when we hire someone to help us, I usually spend the whole day beforehand sifting and putting things away and tossing lots of stuff in the trash so they can focus on cleaning.
This visit was our first round and they just cleaned the kitchen and the bathrooms. I'm hoping by the next visit we'll have cleared out the living and dining rooms⏤they're still a mess of boxes from moving out of storage⏤and we'll get those rooms looking as good.Thursday, June 9, 2022
Loving My New Toy!
Now that we've mostly finished seting up Jeff's home office, I've gotten the opportunity to spend a few days playing with my new toy, a HandiQuilter Long Arm. I am loving it. OK, the learning curve is pretty steep, but I have mostly learned the basics and can do a decent edge-to-edge quilting project.
Yes, I'm going to be swimming in quilts soon, so I guess it's a good thing I started giving them away last year.
![]() |
| The quilts I practiced on in the last 3 days. I'm going to have to learn to love binding. |
It will probably be quite a long time before I feel experienced enough to quilt my really fancy quilts, like the Snake River and Finger Lakes Log Cabin quilts. For now, I am just playing with quicky scrap quilts until I can learn how to use the machine well enough to feel confident I won't mess something up.
If you have an interest in my continuing quilt endeavors, I blog about them at my crafting blog.
Thursday, June 2, 2022
Uplift Desk Assembled
The inexpensive maple table worked great for Jeff's Uplift Desk. It took us an hour or so this afternoon to get it assembled.
I've pulled our Ergotron Monitor Arms out of the storage space, but we're missing the attachment screws for the back of the monitors so I've ordered some. They'll probably arrive before Monday.Wednesday, June 1, 2022
Quick Desktop Project
In January we ordered Jeff an Uplift Desk frame, but the solid wood tops were crazy expensive; like $550-1000 expensive. I couldn't bring myself to spend that much when we have a garage full of wood and some pretty decent tools. But⏤as is so typical for us⏤neither of us had enough motivation to drive the process so the boxes just sat.
After a bit of looking around for more affordable options, I had an idea. I would look for a beat-up table on craigslist or FB marketplace and we would simply take it apart and, if necessary, sand down the top and refinish it. I obviously preferred something that was solid wood and could be cut to size without exposing the cheap inner core of veneer pieces.
Finally, I found this table on the marketplace for $25. The wood is a bit more knotty than I prefer, but it was an amazing deal and was solid wood.
It was slightly larger than would fit in Jeff's desk space so we needed to cut 3" off one edge. It took us far longer to clean up the table saw and space around it than the actual cutting. Then I got started on sanding right away and am nearly finished putting on a few coats of finish.
Hopefully, we'll finally be able to assemble the desk tomorrow but it takes 4 hours of drying time between coats of the finish, so we'll see if I can get enough in throughout the day today.
I'm still hoping once the weather gets nice outside we'll still work on something more decorative with lots of different woods for Jeff's desk, but this will do for now.




















