I've planed down the cedar and our installer did a temporary install on these boards so we could get the spacing right. There will be additional pieces of wood installed at the top and bottom that will hide the ends of the slats.  

Once the lower portions are cut out, we'll mark the diamonds, take out all the wood and cut them out. We'd also like to route the edges of the top rail. Then I'll start finishing it. I've learned from my past mistakes; we'll be finishing before the final install.

I was planning to paint them, but we seem to be out of that white color paint. But we do have lots of the opaque white stain we used on the pergola and fence, so I'm considering staining instead. I really don't understand the difference in durability.