Sunday, April 25, 2021

Closet Shellacked

I finally got my act together this week and continued work on my closet. I varnished the top shelf and did two coats of shellac on all the rest of the woodwork. (I used varnish on the top because I was hoping it would be more durable when we slide tubs and boxes across the surface.) 

We still need to finish making shelves for the cabinets. Unfortunately, the guy we hired to help us with this project cut the wood incorrectly and now we have to either buy more sheets of plywood or piece some of the shelves. Right now, Jeff is trying to piece the wood. 

I've also been working on cleaning my sewing room again. For the past few months, I've had a bad habit of finishing a project and then moving on to the next project without actually cleaning up the mess from the project I just finished. I had piles of fabric all over the place and a mountain of scraps overflowing onto the floor.

I've temporarily shifted some of the stuff from my sewing room into the closet to give myself more room to work. I will likely be moving some of the tubs from the sewing room into the closet permanently, but I still have a lot of boxes I need to unpack first to see how much room I have left.

I ordered brass rods and flanges and we got the rods last week, but the flanges were back-ordered. The shipping date looks like they may come next week. I'm hoping.

Thursday, April 1, 2021

Closet Installed

We made good progress on our closet the past few days. We've installed the fixed shelving on the right side and face frame on the cabinets. Most of the wood was shellacked before it was installed, but I still need to shellac the face frame pieces. I would have shellacked everything, but I was worried there may be damage during the install and I figured it would be easier to touch up just stain.


Back when we did the rest of the closet I bought all the brass rods and brackets we needed to finish this closet, but then we used them in the guest room and sewing room closets, so today I ordered more. (If I had remembered, I would have ordered weeks ago.) I was relieved I could still find them, but it wasn't easy.

We still need to cut plywood shelves for the cabinets. And I have about two weeks to finish shellacking everything before we receive the rods.