The mosaic in the bathroom is laid, but it is still not done. It still needs to be grouted.
Barrett managed to turn this 2-day job into a 4-day job because he had to take so much time off to deal with family stuff (6-days if you include the two sick days). The floor does look nice though and I'm looking forward to it being grouted on Monday.
Now that we've got until next Friday before the cabinet is installed, we'll probably try and get the ceiling installed this coming week. And I'll hopefully get the woodwork for the baseboards stained and varnished so they can be installed too.
No comments:
Post a Comment