Jeff has been working on digging out the floor of the pergola when the weather is cool enough.
I've finished staining the door for the sewing room. Once it finishes drying I'll start putting on the shellac.
I painted the basement bathroom again, but when I removed the masking tape I discovered one of the rolls of blue tape I used was not a good roll; it didn't have good adhesion. There was some bleed through on the woodwork so I'm going to have to do a little bit of paint clean up, which really sucks. It's not my highest priority right now.
I'm hoping now Jeff will hire his friend and they'll install the cabinet and marmoleum flooring. I still need to stain some shoe molding for both the basement and sewing room.
If we want to install the sink and faucet in this bathroom, we will have to cut a temporary plywood top for the sink cabinet because I'm planning to have the soapstone cut for it when we have the soapstone cut for the master bathroom remodel. It won't be pretty, but at least we'll have another operational bathroom during the remodel of the master bathroom.
No comments:
Post a Comment